A five-step wizard drives the report builder. Pre-built templates cover every compliance metric a plant manager wakes up thinking about. Put any of them on a cron and stop chasing the numbers by email.
Step 3 · Filters
Narrow the rows
Live preview
128 rows will match
Each one is an editable clone of the schema, so you are never stuck with our definition. Tune the filters, save, and put it on a schedule.
Build, schedule, filter, deliver. Every surface exists in the product, not in a spreadsheet.
Open, In Progress, Overdue, Breakdowns, Planned vs Unplanned. No login required to see shift blockers.
Schedule
Weekly PM compliance
Pick a template, add recipients, set a cron. Monday at 7am, every Monday.
Downtime · 7d
Top causes
Which 20 percent of causes drive 80 percent of losses. One chart, one week.
work-orders-Q1.xlsx
216 rows · 8 sheets
Bulk WO export to PDF or Excel with linked parts, labor, comments, and audit history.
No BI license. No cross-system join. The report builder already sits on top of the work orders, assets, PMs, parts, and labor hours your plant generates.
Report type → data source → filters → grouping → output format. Non-technical users ship a report in three minutes.
Asset Health, Breakdown, PM Compliance, MTTR, MTBF, downtime Pareto, cost by asset / craft, aging backlog, shift handover. All editable.
Daily, weekly, monthly, quarterly. Dovient sends the PDF or Excel to the recipient list. Nobody chases the numbers.
Multi-line plants isolate a report to one line, one cell, or one equipment class in a single click.
Excel exports include linked sheets for cost, parts, labor, and audit history so finance gets the full trace.
Open WOs, In Progress, Overdue, Breakdowns, Planned vs Unplanned. No login required for the shift blockers view.
30 and 90-day trend lines on every reliability KPI so improvement is measurable, not anecdotal.
Export 10 or 10,000 WOs to Excel in one click. Each sheet contains parts, labor, comments, and the revision log.
Ask the Copilot 'show me downtime by cause for line 3 last week' and the report builds itself. Save it, schedule it.
We killed three weekly spreadsheets in the first month. The Report Builder replaced the one our reliability engineer used to hand-build every Friday afternoon.
Plant Manager · Automotive Assembly Plant
3 min
From wizard to saved report
Non-technical users hit publish without writing a line of SQL.
10
Pre-built templates
Every compliance report a plant manager already knew they needed.
0
BI licenses required
The report builder runs on the same data your team is already writing.
Every row in a report starts with a work order. Filter by status, craft, asset, or cost.
Learn morePM compliance rolls up by craft and area with live delivery to the reliability engineer.
Learn moreOEE, downtime pareto, and planned vs unplanned all live on the operational dashboard.
Learn moreCost by asset sorts by lifetime spend so reliability engineers know which machines to replace.
Learn moreSave a template, set a cron, add the recipients. Your inbox gets the number you were going to look for anyway.