Dovient projects are an operational hub. Milestones with weighted phases, tasks with owners, documents in one place, and linked work orders that roll up real cost. One view, one truth, one timeline.
Honest scope: operational project hub, not a financial capex budgeting system. See the FAQ below for what's in and what's not.
Project
Line 4 drive upgrade
Active · due Jul 18
Linked WOs
14
Real spend
$82.4k
Every level rolls up to the one above. Tasks link to work orders, work orders link back to the milestone, the milestone weights into the project.
The initiative. Owner, due date, members, timeline.
Ordered phases with weight % and status.
Assigned to people, optionally linked to a WO.
Real labour, real parts, real cost. Rolls up.
Timeline, tasks, members, documents. The operational spine of any plant upgrade.
Milestones · Line 4
Phases with weight %, completion, and the current blocker highlighted.
Tasks · install phase
Task-level ownership. Status, due date, linked work order, assigned members.
Documents · 14
Drawings, permits, RFQ responses, vendor contracts. One place, not a shared drive.
Real spend
$82,420
from 14 linked WOs
Real cost from linked work orders. No separate budgeting system required to see the number.
Dovient is the operational hub. The numbers come from real work orders, not a separate budgeting spreadsheet.
Weighted phases (design 10%, build 60%, test 30%) with due dates and status. Dashboard shows which milestone is the blocker.
PENDING, IN_PROGRESS, STUCK, COMPLETED, CANCELLED. Assignees, due dates, optional WO link.
Tasks link to work orders. The WO's cost ledger (labor + parts + vendor) rolls up into the project's real spend.
Because every WO writes labor and parts costs already, you get a true project cost without integrating a budgeting system.
Horizontal bars for the project, milestones inside with completion, current position marker. Hover to see linked tasks.
Drawings, permits, RFQ responses, vendor contracts, photos. One project folder, not a shared drive.
Project manager, engineers, techs, vendor contacts. Each member sees the tasks and documents they are assigned to.
A WO says 'this job is part of Project X, Milestone Install'. The tech gets context without a separate tool.
Ask the Copilot 'where are we on Line 4 upgrade' and get the milestone breakdown, the blocker, the spend, and the top three risks.
We used to run plant-upgrade projects in Excel and email. Dovient projects gave us one timeline, and because every task linked to a work order, the real spend came out of the CMMS ledger without us building anything.
Engineering Manager · Steel Plant
1
Timeline source of truth
Project, milestones, tasks, linked WOs all in one view. No more Excel fights.
0
Lines of project-spend middleware
Real cost rolls up from the work order ledger automatically.
100%
Task-to-WO traceability
Every task that does real work is a WO with labor, parts, and cost.
Tasks link to WOs. The WO cost ledger rolls up into the project real spend.
Learn moreVendor-sourced project work links to the vendor expense record automatically.
Learn moreProject milestone gates can trigger approval workflows (hand-off from design to install).
Learn moreProject rollups, spend per phase, and aging by task in the report builder.
Learn moreCreate one project, add the milestones, link the first few work orders, and watch the spend roll up on its own.