What an SPCC plan is
SPCC stands for Spill Prevention, Control, and Countermeasure. EPA's rule at 40 CFR part 112 requires facilities that store oil, and could spill it into a waterway, to write a plan for preventing spills and cleaning them up, and then to follow it. Gasoline, diesel, kerosene and used motor oil all count as oil.
Does your gas station need one
A station needs an SPCC plan when its aboveground oil storage capacity is more than 1,320 gallons, or its completely buried storage capacity is more than 42,000 gallons, and a spill could reasonably reach navigable waters (112.1). Only containers of 55 gallons or more are counted.
The key point for most stations: underground tanks that meet EPA's UST rules in 40 CFR part 280, or an approved state UST program, are exempt and not counted toward the buried total (112.1(d)(4)). A station that sells fuel only from USTs often needs no SPCC plan. A station is more likely to be covered when it also has aboveground tanks, such as a diesel or kerosene tank, a used oil tank, or drums of lube oil, adding up to more than 1,320 gallons.
What the plan makes you do, and how often
- Certify the plan: a Professional Engineer certifies it, unless you are a qualified facility with 10,000 gallons or less aboveground and a clean spill history, which may self-certify (112.3(g), 112.6).
- Secondary containment for each bulk container, sized for the largest container plus room for rain (112.8(c)(2)).
- Inspect and test aboveground containers on a regular schedule set by industry standards, such as STI SP001, and after material repairs (112.8(c)(6)).
- Follow written inspection procedures and keep signed inspection records with the plan for 3 years (112.7(e)).
- Train oil handling staff and hold a discharge prevention briefing at least once a year (112.7(f)).
- Review the plan at least every 5 years and sign a statement saying whether it will be amended (112.5(b)). Amend it within 6 months of a change that affects spill potential, such as adding a tank (112.5(a)).
What an EPA inspector looks at
An inspector will ask to see the plan on site, check that it is certified and that the five-year review is signed, and compare the tanks listed in it to what is actually there. They look at the containment around each tank, drain valves on dikes (closed and sealed), signs of leaks or stains, and your signed inspection records and annual briefing records.
SPCC inspection checklist for aboveground tanks
On the schedule in your SPCC plan, often monthly
Tanks and containers
- No leaks, drips or stains on the tank shell
- No rust, dents or bulges on the tank
- Tank supports and foundation sound
- Level gauge and vents working, not blocked
- Tank labeled with its contents
Secondary containment
- No oil or water in the dike or interstice
- Dike walls and floor not cracked
- Dike drain valve closed and locked
- Drums stored on spill pallets or in containment
Piping and transfer area
- Aboveground piping not leaking or corroded
- Valves and fittings tight, not dripping
- Hoses and nozzles in good condition
- Truck unloading area clear, no stains
Response and records
- Spill kit stocked and in its place
- Emergency contacts posted
- Last inspection signed and filed with the plan
- Annual briefing held and recorded
Inspected by, date and notes go at the bottom of the printed sheet.
Run it in Dovient Lite
Add each aboveground tank, the used oil tank and the drum storage area as assets. Set a schedule at the frequency your plan lists with this checklist attached; a work order opens when it is due, and the person doing the inspection marks each item on the phone with a photo of any stain or damage. The completed checklist stays on the tank's record with who did it and when, and the work orders export as a PDF to file with your SPCC plan.
Start with Dovient LiteSources
- EPA, Oil pollution prevention (SPCC rule), 40 CFR part 112
- EPA, Oil spills prevention and preparedness regulations
Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.
Questions
- Does a gas station with only underground tanks need an SPCC plan?
- Usually not. USTs that meet EPA's part 280 rules or an approved state program are exempt from SPCC and do not count toward the thresholds, so the question is whether your aboveground oil storage is over 1,320 gallons.
- Can I write my own SPCC plan?
- Yes, if you are a qualified facility: 10,000 gallons or less of aboveground oil storage and no reportable spills over the limits in the last three years. Tier I facilities, with no single aboveground container over 5,000 gallons, can use EPA's template.
- How often do I have to review the SPCC plan?
- At least once every five years, with a signed statement of the review. You also amend it within six months after any change that affects spill potential.
- How long do I keep SPCC inspection records?
- Three years, signed by the inspector or supervisor and kept with the plan.