Who sets mobile home park rules and regulations
Parks are licensed and inspected by the state, or by a county or city the state delegates to. The rules cover what the park owner maintains: roads, drainage, water and sewer, electrical service to the lots, lighting, common buildings, trash and the condition of vacant lots. The homes themselves are mostly the residents' responsibility, while their installation is covered by HUD and state rules.
A few examples. In Florida, the Department of Health licenses parks under Chapter 64E-15 of the Florida Administrative Code, and county health departments inspect drinking water, sewage, solid waste and pest control. In California, the Department of Housing and Community Development (HCD) runs the Mobilehome Parks Program under the Mobilehome Parks Act and Title 25, including park maintenance inspections, or a local agency does it. In Michigan, LARA's Mobile Home Section licenses manufactured housing communities under the Mobile Home Commission Act. Read your own state's rules for the details.
If the park runs its own water system
A park well that serves at least 15 connections or an average of 25 people at least 60 days a year is a public water system under the Safe Drinking Water Act. Most year-round parks of that size are community water systems, with required sampling, a certified operator in most states, and records for the state drinking water program. Park-owned sewer lagoons or treatment plants carry their own permit and testing. Your state drinking water and wastewater programs set the schedule.
How often to inspect and what to keep
Keep the inspection records, repair work orders with dates, water and wastewater test results, and resident complaints with how they were resolved. When a state inspector cites an item, the dated repair record is how you show it was corrected. The same records are what a buyer asks for in mobile home park due diligence.
- Monthly: walk the whole park with the checklist below.
- After storms: roads, drainage, trees, power lines and lot electrical pedestals.
- Before winter: water line heat tape and insulation at park-owned risers, drains clear.
- Yearly: park electrical and lighting, playground, pool and clubhouse fire equipment.
Mobile home park monthly inspection
Monthly, and after major storms
Roads and drainage
- Roads without potholes or washouts
- Speed and street signs in place
- Storm drains and ditches clear
- No standing water on lots or roads
Utilities
- Lot electrical pedestals closed and undamaged
- No water leaks at meters or risers
- Sewer cleanouts capped, no odor or backup
- Well house or lift station secure and running
- Street and common area lights working
Common areas
- Clubhouse and laundry clean and working
- Playground equipment intact, surfacing in place
- Pool gate self-closes and latches
- Fire extinguishers in common buildings charged
Lots and grounds
- Vacant lots mowed and clear of debris
- Dumpster areas clean and lids closed
- Trees clear of power lines and homes
- No abandoned vehicles or junk on lots
Inspected by, date and notes go at the bottom of the printed sheet.
Run it in Dovient Lite
Add the park's roads, well, lift station, clubhouse, pool and lighting circuits as assets with their locations, and set a monthly schedule with this checklist. The manager walks the park with the phone, marks each item pass, warning or fail and adds photos; the completed inspection stays on record with who did it and when. Repairs become work orders, staff can report problems from the phone, and completed work exports as PDF for a state inspector or a buyer.
Start with Dovient LiteSources
- EPA, Information about public water systems
- Florida Department of Health, Mobile home parks
- California HCD, Mobilehome Parks
- Michigan LARA, Mobile Home Section
Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.
Questions
- Who inspects mobile home parks?
- A state agency, such as a health department or housing department, or a county or city it delegates to. Ask your state's park licensing program how often they inspect.
- How often should a park owner inspect the park?
- A monthly walk with a checklist is a common practice, plus a check after major storms. That catches problems before residents complain or an inspector cites them.
- Is a mobile home park well a public water system?
- It is if it serves at least 15 service connections or an average of at least 25 people for at least 60 days a year. Then federal and state drinking water rules apply.
- What maintenance records should a mobile home park keep?
- Inspection checklists, repair work orders with dates, water and wastewater test results, and resident complaints and how they were resolved.