Who sets the rules for park water and sewer
If your park has its own well and serves at least 15 service connections, or at least 25 people on average for 60 days or more a year, it is a public water system under the Safe Drinking Water Act (40 CFR 141.2). Your state drinking water program then sets your sampling schedule, operator certification and reporting. Parks on city water still own the lines from the meter to each home site.
Septic systems, drain fields and lift stations are permitted by the state environmental agency or the county health department. Large or shared septic systems usually carry a permit with set inspection, pumping and reporting terms. Read your permits first and build the schedule around them; the intervals below are a starting point where the permit is silent.
Septic system maintenance schedule
- Monthly: walk the drain field for wet spots, odor, sewage at the surface or lush green strips.
- Monthly: check tank lids and risers are intact, secured and not driven over.
- Every 3 years: inspection by a licensed septic contractor, which EPA recommends as a general guide.
- Every 3 to 5 years, or as the contractor advises: pump each tank, and keep the hauler's receipt.
- Pumps and effluent filters on pumped systems: clean or check at the interval in the system's operating manual.
Lift station maintenance
A lift station failure means sewage backing up into homes, so it gets the most frequent checks. Many parks check stations weekly, and the pump service runs by pump hours or on the manufacturer's interval.
- Weekly: confirm the high-level alarm and light work, using the test button or by lifting the float.
- Weekly: confirm both pumps run and alternate, and listen for grinding or vibration.
- Weekly: look at the wet well for grease buildup, debris and stuck floats.
- Monthly: check the control panel for moisture, burnt contacts and tripped breakers.
- Every year or by run hours: have pumps pulled, impellers and seals checked, and check valves serviced.
Mobile home park water lines
- Monthly: walk the main runs for wet ground, sinkholes or unusual green spots that point to a leak.
- Quarterly: exercise main shutoff valves so they still turn when you need them.
- Yearly, before the first freeze: check heat tape and insulation on risers at each site.
- As your permit requires: well and chlorinator checks, and the coliform samples your state schedules.
- After every repair: record the location, pipe size and material, so the next crew can find it.
What to record
For each check: the date, who did it, the station or tank, what was found and what was done. Keep pump-out receipts, contractor reports and lab results with the record. State inspectors and buyers of the park both ask for this history, and it shows which pumps and lines keep failing.
Run it in Dovient Lite
Add each lift station pump, septic tank, well and main valve as an asset with its location. Set a weekly schedule for the lift station checklist, a run-hour schedule for pump service from the pump's hour meter, and dated schedules for pump-outs and contractor inspections; a work order opens when each one is due. Attach the hauler's receipt or lab result to the completed work order, and export the records as a PDF when the state inspector asks.
Start with Dovient LiteSources
Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.
Questions
- How often should a mobile home park septic tank be pumped?
- EPA's general guide is to have systems inspected about every 3 years and pumped every 3 to 5 years. Shared park systems carry more flow, so follow your permit and your septic contractor's advice on tank levels.
- How often should a lift station be checked?
- Weekly is common: alarm test, both pumps running and alternating, and a look at the wet well. Pump service follows the manufacturer's interval or run hours, and your state permit may set its own terms.
- Is my park's well a public water system?
- Yes, if it has at least 15 service connections or serves an average of at least 25 people for at least 60 days a year. Your state drinking water program will set sampling and operator requirements.
- What's a good maintenance schedule for a mobile home park?
- Weekly lift station checks, monthly walks of drain fields and water mains, quarterly valve exercising, and yearly freeze prep and contractor inspections. Add the sampling and reporting dates from your water and septic permits.