Manufacturing preventive maintenance & TPM program

How to set up a plant maintenance program for a machine shop or small plant: preventive maintenance by hours and dates, operator daily checks in the TPM style, and the records that show it works.

PM and TPM in plain terms

Preventive maintenance (PM) is planned service done before a machine fails: lubrication, filter changes, way wiper and coolant checks, belt and spindle inspections. Total productive maintenance (TPM) adds operators to the routine. The person who runs the machine does the daily cleaning, lubrication and inspection, and reports small problems before they become breakdowns. The maintenance tech handles the planned services and repairs.

For a shop with a handful of techs, start with the basics: a list of machines, a schedule for each, a daily operator check, and a way to report breakdowns. Add the rest once those run every week without anyone chasing them.

Set up the program step by step

  1. List every machine with its make, model, serial number and location. Mark the ones that stop production when they go down; start with those.
  2. Pull the maintenance section from each manual and turn it into tasks with intervals in hours or calendar time.
  3. Split the tasks: daily and weekly items to the operator (clean, check levels, lube, listen), and monthly and yearly items to maintenance.
  4. Write a short checklist for each task so the same work gets done every time.
  5. Put hour meters on the schedule for machines that run uneven shifts, and calendar dates for the rest.
  6. Track every breakdown as a work order with the downtime, so you can see which machines need more PM or a rebuild.

A typical CNC and shop schedule

  • Daily (operator): clean chips, check way lube and coolant level, check air pressure, warm up the spindle, wipe the way covers.
  • Weekly (operator): clean coolant tank screen, check coolant concentration with a refractometer, check chip conveyor.
  • Monthly or every 500 hours (maintenance): inspect way wipers and covers, check belts, clean electrical cabinet filters, check hydraulic level.
  • Every 6 months or 2,000 hours: change hydraulic oil and filter as the maker says, check backlash and level, clean the coolant tank.
  • Yearly: ballbar or alignment check, spindle runout, full inspection by the maker or a service tech.
  • Compressors, cranes and other plant equipment: on their own makers' schedules, plus OSHA-required inspections such as overhead crane checks under 1910.179.

Safety and records

Most PM work needs the machine locked out. OSHA 29 CFR 1910.147 requires a written energy control procedure and a periodic inspection of each procedure at least once a year. Keep your lockout steps on the PM checklist so they are not skipped.

For each machine, keep the work done, by whom, when, parts used and the downtime. After three to six months you can see what the program is doing: fewer breakdowns, shorter repairs (MTTR) and longer time between failures (MTBF).

Run it in Dovient Lite

Add each machine as an asset, then set preventive maintenance schedules by date or by hour meter with the checklist attached; a work order opens when each one is due. Operators do their daily check on the phone, marking each item pass, warning or fail, and report breakdowns as service requests with a photo. Parts used come off stock and add to the machine's cost, and the dashboard shows open and overdue work, downtime, MTTR and MTBF.

Start with Dovient Lite

Sources

Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.

Questions

How do I start a preventive maintenance program in a machine shop?
List your machines, pick the ones that stop production when they fail, and turn their manuals into scheduled tasks with checklists. Give operators the daily checks and maintenance the monthly and yearly work.
What is the difference between PM and TPM?
PM is planned maintenance done by the maintenance team. TPM adds operators to the routine with daily cleaning, lubrication and inspection, so problems are caught early.
Should PM be by hours or by calendar?
Use hours for machines that run uneven shifts, because wear follows run time. Use calendar dates for machines that run steady shifts and for items that age with time, such as hydraulic oil.
How do I know the PM program is working?
Track breakdowns and downtime per machine. Fewer unplanned stops, a lower MTTR and a longer MTBF over a few months show it is working.