What OEE measures
OEE, overall equipment effectiveness, compares what a machine produced with what it could have produced in the time it was scheduled to run. It is the product of three rates:
- Availability: run time divided by planned production time. Breakdowns, setups and waiting for material lower it.
- Performance: (ideal cycle time x total count) divided by run time. Slow cycles and short stops lower it.
- Quality: good parts divided by total parts. Scrap and rework lower it.
A worked example
A CNC lathe is scheduled for an 8-hour shift, 480 minutes. It is down 45 minutes for a coolant pump failure and 15 minutes for a setup, so it runs 420 minutes. Availability is 420 / 480 = 87.5%.
The ideal cycle time is 1.5 minutes and it made 250 parts: 1.5 x 250 = 375 minutes of ideal time over 420 minutes run. Performance is 89.3%. Of the 250 parts, 240 were good, so quality is 96%.
OEE = 0.875 x 0.893 x 0.96 = 75%. The biggest loss here is availability, and most of it was one breakdown. That is where maintenance can help.
How to track machine downtime
- Give every machine a record with an ID and location, so stops are logged against the right one.
- When a machine stops, mark it down and record the start time, the reason and who reported it.
- When it runs again, record the end time and what was done, including parts.
- Separate planned stops (setups, preventive maintenance) from unplanned breakdowns.
- Each week, rank machines by unplanned downtime hours and number of breakdowns, and look at mean time to repair (MTTR) and mean time between failures (MTBF).
- Pick the top one or two machines and fix the cause, not just the symptom.
A maintenance schedule that protects availability
Take intervals from each machine's manual and adjust them with your breakdown history. A machine that keeps failing the same way needs a shorter interval or a different task.
- Each shift: operator check of way lube, coolant level, air pressure, chip buildup and guards.
- Weekly: clean chip conveyors and coolant tank screens, check hydraulic level and leaks.
- Monthly: check way covers and wipers, spindle warm-up and noise, belts and filters.
- By spindle hours or yearly: ballscrew and gib checks, spindle service, coolant tank cleanout, and the items in the machine builder's maintenance chart.
Run it in Dovient Lite
Dovient Lite does not calculate OEE, but it gives you the availability side. Each machine is an asset with a status; when it breaks down, an operator reports it from the phone and marks it a breakdown, the request becomes a work order, and the machine shows as Failed until it is fixed. The dashboard shows downtime, MTTR and MTBF, and preventive schedules by date or by hours keep each machine's checklist coming up on time.
Start with Dovient LiteQuestions
- What is a good OEE score?
- It depends on the process. A widely quoted benchmark for top discrete manufacturers is 85%, and many job shops run well below that. Track your own trend and the biggest losses rather than chasing a number.
- What is the difference between OEE and downtime?
- Downtime is one input to OEE. It lowers availability, while slow cycles lower performance and scrap lowers quality.
- How do I start tracking machine downtime?
- Log every stop against the machine with a start time, end time and reason, and separate planned from unplanned stops. After a few weeks, rank machines by unplanned hours.