Dovient

Manufacturing maintenance software

Service every machine by spindle hours, not by memory

CNC machines get serviced by spindle hours, operators do their daily checks and report breakdowns on a phone, and every repair, part and hour of downtime stays on the machine's record.

Shop floor lined with CNC machining centers

CNC preventive maintenance by spindle hours

Give each CNC a spindle hour meter and set intervals in hours: way lube and coolant filter checks every 500, a ballscrew backlash check every 2,000, a spindle and drawbar service every 4,000. When someone enters the hour reading from the control, Dovient Lite opens a work order for every service that is due. Air compressors, saws and the coolant system can run on dates instead, or on whichever comes first.

Manufacturing preventive maintenance and TPM program
Dovient Lite preventive maintenance schedule: CNC preventive maintenance by spindle hours for a machine shop or manufacturing plant

CNC daily checks on the operator's phone

The operator starts the shift with the machine's daily checklist: way lube level, coolant level, coolant concentration from the refractometer (typed in, for example 7%), air pressure at the regulator, chip conveyor running, guards and door interlocks in place. Each item is marked pass, warning or fail, with a photo of anything wrong. The check is saved on that machine's record with who did it and when.

Dovient Lite checklist on a work order (technician view): CNC daily checks on the operator's phone for a machine shop or manufacturing plant

Operators report breakdowns from the floor

A lathe throws a spindle overload alarm or a mill's coolant pump stops. The operator picks the machine in the app, describes the problem, adds a photo of the alarm screen and marks it a breakdown. Maintenance is notified, turns the report into a work order, and the operator can see when the machine is back.

Dovient Lite report a problem from the phone, with photo and breakdown flag: Operators report breakdowns from the floor for a machine shop or manufacturing plant

Spare parts with a minimum on the shelf

Keep way lube, coolant concentrate, filters, belts, bearings, drawbar springs and compressor service kits in the parts list with a minimum quantity for each. Parts used on a work order come off stock and add to that machine's cost, and anything below its minimum is marked low stock.

Dovient Lite parts inventory with stock levels and low-stock flags: Spare parts with a minimum on the shelf for a machine shop or manufacturing plant

Every repair in one list, every machine's status

Each repair is a work order: who reported it, who is working on it, the photos, the notes and the status. The maintenance lead assigns jobs from the office, technicians update them from a phone, and overdue work shows on the dashboard. A machine that is down is marked failed, so the scheduler knows which work centers can take jobs today.

Machine downtime tracking: which machines stop most

The dashboard counts breakdowns and hours of downtime, shows the average time to repair (MTTR) and time between failures (MTBF), and lists the machines that fail most often. When one horizontal mill keeps losing its tool changer, you see it in the numbers and can plan a proper repair instead of another quick fix.

OEE and machine downtime tracking

Each machine's history and maintenance cost

Every machine has one record: make, model and serial number, its PM schedule, every work order, the parts used and what it has cost in labor, parts and outside service calls. Before you pay for a spindle rebuild on a 15-year-old machine, you can see what it has already cost this year.

Lockout/tagout audits and safety inspections on record

Set the annual review of each machine's lockout/tagout procedure (OSHA 1910.147) as a yearly schedule with a checklist: procedure followed, energy sources isolated, employees reviewed, and the inspector's name. Monthly guard walks and hoist and crane inspections run the same way. Completed checks export as a PDF for an OSHA visit or your insurer.

Lockout/tagout (LOTO) procedure template

How setup works

  1. 1

    Add your machines

    Import your machine list from a spreadsheet (CSV or Excel) or add machines one at a time.

  2. 2

    Set checks and intervals

    Choose the checklists each machine needs (operator daily, weekly, annual LOTO review) and the service intervals in spindle hours or days.

  3. 3

    Invite your operators and technicians

    They install the app and sign in. Operators see the day's checks for their machines; technicians see the repairs assigned to them.

Set up Dovient Lite with us

Tell us how many machines you run. We'll go through your PM intervals and safety checks with you and set up your account.

Prefer to start on your own? Start with Dovient Lite

Machine shop checklists and guides

All templates

Questions

What is manufacturing maintenance software?

Software that keeps every machine's scheduled maintenance, repairs, parts and downtime in one record. Dovient Lite does this for small teams: PM by spindle hours or date, operator checks and breakdown reports on a phone, and a maintenance history and cost for each machine.

Can I schedule CNC maintenance by spindle hours?

Yes. Each machine can have an hour meter, and services can be set every so many hours, every so many days, or whichever comes first. Readings are entered by hand from the control (or by API). A new reading opens a work order for anything that is due.

What does OSHA require for lockout/tagout inspections?

Under OSHA 1910.147(c)(6), each energy control procedure must be inspected at least once a year by an authorized employee other than the ones using it. The employer certifies the inspection with the machine, the date, the employees included and the person who did it. In Dovient Lite that is a yearly checklist per machine, and the completed record exports as a PDF.

How often do machine guards and overhead cranes need inspecting?

OSHA 1910.212 requires guarding at the point of operation and other hazard points but sets no inspection interval, so shops set their own, often a monthly walk. For overhead cranes and hoists, OSHA 1910.179 calls for frequent inspections (daily to monthly) and periodic inspections (every 1 to 12 months), depending on the item and how hard the crane works.

How does it track machine downtime?

An operator or technician marks a request or work order as a breakdown, and the machine's status shows it is down until the repair is closed. The dashboard adds up breakdowns and downtime hours and shows MTTR, MTBF and the machines that fail most often.

Does Dovient Lite calculate OEE?

No. Dovient Lite tracks maintenance downtime, breakdowns, MTTR and MTBF, which feed the availability side of OEE. It does not count parts produced or cycle times, so it does not give you a full OEE figure.

Does a failed operator check open a repair automatically?

Not automatically. A failed or warning item is saved on the machine's record with the photo, and the maintenance lead or the operator opens a work order from it. This keeps someone deciding whether a low coolant reading needs a technician or just a top-up.

Can I track parts and repair costs per machine?

Yes. Parts used on a work order come off stock and their cost goes to that machine, along with labor and any outside service charges you enter, such as a spindle rebuild shop or the OEM's service tech. Each machine's record shows its cost, and you can export cost by asset.

Is Dovient Lite plant maintenance software or an EAM?

Dovient Lite is plant maintenance software (a CMMS) for small shops, factory floors and industrial plants: work orders, preventive maintenance, parts and downtime. EAM software (enterprise asset management) adds multi-site asset lifecycle, purchasing and capital planning; that is the full Dovient platform, not Lite.

What OSHA standards and compliance checks apply to a manufacturing plant?

The OSHA regulations and manufacturing requirements most shops are inspected on: lockout/tagout (1910.147), machine guarding (1910.212), forklifts (1910.178), overhead cranes (1910.179), compressed air (1910.242) and walking surfaces (1910.22). A monthly plant inspection checklist on a phone, with photos, gives you the inspection record and a list of what to fix. The same works for a plant shutdown checklist or a 5S checklist.

How much does Dovient Lite cost?

Plans and prices are on the Dovient Lite pricing page: dovient.com/lite/pricing.

Reviewed

Service every machine by spindle hours, not by memory