Dovient

Food plant maintenance software

Maintenance records your auditor can trace line by line

Metal detector and thermometer checks are done on a phone, equipment PMs come due by run hours or date, and every repair carries its sanitation clearance into the records your FSMA plan and SQF or BRCGS auditor ask for.

Food plant worker checking cans on a production line

Metal detector and thermometer checks each shift

QA or the line lead runs the metal detector check at start-up and every shift: ferrous, non-ferrous and stainless test pieces passed through, reject device working, each marked pass or fail. Thermometer checks against an ice bath are typed in (for example 32.2°F) and marked pass or fail. The records sit on each line's equipment record with who did them and when, ready for your HACCP or preventive controls verification.

HACCP plan template and guide
Dovient Lite checklist on a work order (technician view): Metal detector and thermometer checks each shift for a food manufacturing plant

Preventive maintenance by run hours and date

Give fillers, mixers, ovens, slicers and conveyors an hour meter and set intervals in hours: gearbox oil every 2,500, bearings and chains every 500. Date-based items such as the monthly air compressor check or the quarterly boiler service run on the same schedule. The work order opens when the service is due, assigned to the technician on the schedule, with its checklist attached.

Food plant preventive maintenance program
Dovient Lite preventive maintenance schedule: Preventive maintenance by run hours and date for a food manufacturing plant

Line operators report problems from the floor

An operator sees a guard bolt missing on the slicer or a conveyor belt fraying. They pick the equipment in the app, describe it, add a photo and mark it a breakdown if the line has stopped. Maintenance is notified, turns it into a work order, and the operator can see its status.

Dovient Lite report a problem from the phone, with photo and breakdown flag: Line operators report problems from the floor for a food manufacturing plant

Food grade lubricants and spare parts on the shelf

Keep NSF H1 food grade grease and oil, bearings, belts, seals, gaskets and blades in the parts list with a minimum quantity for each storeroom. Parts used on a work order come off stock and add to that machine's cost, and anything below its minimum is marked low stock.

Dovient Lite parts inventory with stock levels and low-stock flags: Food grade lubricants and spare parts on the shelf for a food manufacturing plant

Repairs and sanitation clearance in one list

Each repair is a work order: who reported it, who is on it, photos, notes and status, with overdue work counted on the dashboard. Repairs in a production area carry a clearance checklist: tools and parts removed, no loose metal or debris, area cleaned and sanitized, QA released. Sanitation or QA completes it on the phone before the line restarts, so the record shows who cleared it and when. Weekly and monthly deep cleans from your master sanitation schedule can run as scheduled work orders by line.

Master sanitation schedule and sanitation SOPs

Line downtime: which equipment stops most

The dashboard counts breakdowns and hours of downtime, shows the average time to repair (MTTR) and time between failures (MTBF), and lists the equipment that fails most often. When the case packer on line 2 keeps jamming, the numbers show it next to what it has cost.

Each machine's history and cost

Every piece of equipment has one record: make, model and serial number, its PM schedule, every work order and clearance, the parts used and what it has cost in labor, parts and outside service. When an auditor asks about a repair from March, it is on the filler's record.

Records for FSMA and SQF or BRCGS audits

Before an FDA inspection or a certification audit, export completed PMs, repairs with their sanitation clearances, and the shift checks as a PDF. The QA manager hands the auditor one report instead of pulling binders from three offices.

SQF, BRC and GMP audit checklist

How setup works

  1. 1

    Add your lines and equipment

    Import your equipment list from a spreadsheet (CSV or Excel) or add machines one at a time, grouped by line.

  2. 2

    Set checks and schedules

    Choose the checklists each line needs (metal detector, sanitation clearance, PMs) and the intervals in run hours or days.

  3. 3

    Invite your technicians, QA and line leads

    They install the app and sign in. Technicians see the repairs and PMs assigned to them; QA and line leads see the checks and clearances to complete.

Set up Dovient Lite with us

Tell us how many production lines you run. We'll go through your equipment checks and PM intervals with you and set up your account.

Prefer to start on your own? Start with Dovient Lite

Food plant checklists and guides

All templates

Questions

What is food manufacturing maintenance software?

Software that keeps every machine's preventive maintenance, repairs, parts and equipment checks in one record, with the clearance and sign-off details food safety audits ask for. Dovient Lite does this for small teams: checks on a phone, PMs by run hours or date, and PDF records for FSMA and certification audits.

What does FSMA require for equipment maintenance?

Under FDA's current good manufacturing practice rules (21 CFR 117 subpart B), equipment must be designed and maintained so it can be cleaned and doesn't contaminate food, and instruments such as thermometers must be accurate and maintained. Records your food safety plan requires, such as calibration and verification records, must be kept for at least two years (21 CFR 117.315).

What do SQF and BRCGS auditors look for in maintenance?

Both codes expect a planned maintenance program, control of temporary repairs, food grade lubricants where there is a risk of contact with product, and a documented hygiene or sanitation clearance after maintenance work before production restarts. Check the edition of your code for the exact clauses.

How does sanitation clearance after a repair work?

The repair work order carries a clearance checklist. After the technician finishes, sanitation or QA completes it on a phone (tools removed, area cleaned and sanitized, released for production) and the record shows who did it and when. Dovient Lite doesn't stop the line itself: your procedure says the line waits for the clearance.

Does a failed metal detector check alert QA automatically?

No. A failed item is saved with the time, the person and any photo, but Dovient Lite doesn't send an alert or open a work order on its own. Your procedure for a failed check (hold product, re-test, call maintenance) stays the same, and the person who runs the check opens a work order if the detector needs repair.

Is Dovient Lite a food safety management system?

No. It handles the maintenance side: equipment PMs, repairs, sanitation clearance, equipment checks and their records. It doesn't write your HACCP or food safety plan, manage suppliers or trace lots.

Can I schedule maintenance by run hours?

Yes. Each machine can have an hour meter (or any counter, such as cycles), and services can be set every so many hours, every so many days, or whichever comes first. Readings are entered by hand or by API.

Can I track maintenance costs per machine or line?

Yes. Labor, parts and outside service charges on each work order add to that machine's cost, and you can export cost by asset to see which equipment costs most to keep running.

Is Dovient Lite food processing software?

It is maintenance software for food processing and food factory equipment. It does not run production, batches, recipes or traceability; keep your ERP or production software for those.

What OSHA and food safety requirements cover maintenance in a food plant?

FDA's food safety rules (21 CFR 117) require equipment that is maintained, cleanable and kept from contaminating food, with records. OSHA covers worker health and safety: lockout/tagout (1910.147), machine guarding (1910.212) and chemical safety where it applies. Your maintenance and sanitation logs show both: what was done, by whom and when.

How much does Dovient Lite cost?

Plans and prices are on the Dovient Lite pricing page: dovient.com/lite/pricing.

Reviewed

Maintenance records your auditor can trace line by line