An IIAR 6 style inspection checklist for an ammonia refrigeration system, organized by equipment, with how IIAR 6 and IIAR 9 fit together and what records to keep.

What IIAR 6 and IIAR 9 are

ANSI/IIAR 6 is the IIAR standard for inspection, testing and maintenance of closed-circuit ammonia refrigeration systems. It lists minimum tasks for each type of component (compressors, condensers, vessels, evaporators, piping, valves, relief devices, detection and ventilation) and how often they are done, from daily operator observations to annual inspections and longer-cycle tests. Fire and mechanical codes reference IIAR standards, and many PSM programs use IIAR 6 as their recognized and generally accepted good engineering practice.

ANSI/IIAR 9 sets minimum safety requirements for existing systems: it asks owners to evaluate an older system against a defined list of safety items and fix the gaps. IIAR 6 is the ongoing inspection program; IIAR 9 is the one-time check (with periodic revalidation) that the system meets a safety baseline.

IIAR standards are sold by IIAR and the exact tasks and frequencies vary by edition. Use the edition your PSM program, fire code official or insurer references, and treat the checklist below as a starting point, not a substitute for the standard.

How often and who does it

  • Daily or each shift: operators fill in the engine room log and walk the machinery room.
  • Periodic: the tasks in IIAR 6 for each component, many of them annual, done by a qualified technician or contractor.
  • Relief valves: replaced on the cycle your program and the valve maker set. Many programs use a five-year cycle based on IIAR guidance; check your edition.
  • Ammonia detectors: tested and calibrated at the interval the detector maker sets.

Records to keep

For each inspection or test, record the date, who did it, the equipment tag, what was done and the result, and any deficiency with the repair that followed. That is also what PSM requires for covered systems (29 CFR 1910.119(j)(4)(iv)). Inspectors, auditors and insurers will sample specific pieces of equipment, so keep records tied to the equipment tag, not in one binder by date.

Ammonia refrigeration inspection checklist

At the IIAR 6 interval for each component, many annually

Compressors

  • Oil level and pressure in normal range
  • No unusual noise or vibration
  • Safety cutouts tested and working
  • No oil or ammonia leaks at seals

Condensers and vessels

  • Condenser coil and fans clean and running
  • Water treatment in service, no scale
  • Vessel shells without corrosion or damage
  • Level controls and gauges working
  • Insulation intact, no ice buildup

Piping and valves

  • Piping labeled with contents and flow
  • No corrosion at supports or insulation
  • Valve packing not leaking
  • Hangers and supports secure

Relief and safety systems

  • Relief valves within replacement date
  • Relief vent lines clear and capped
  • Ammonia detectors tested and in date
  • Machinery room ventilation starts on alarm
  • Emergency shutoff switch works and is labeled

Machinery room

  • Doors self-close and signs posted
  • Eyewash and safety shower working
  • Room clear of storage and combustibles

Inspected by, date and notes go at the bottom of the printed sheet.

Run it in Dovient Lite

Add each compressor, condenser, vessel, relief valve header and detector as an asset with its tag and location, and set schedules by date or by compressor run hours with the matching checklist. Operators and technicians mark each item pass, warning or fail on the phone with photos, and every completed checklist stays on that asset's record with who did it and when. Deficiencies become corrective work orders, and completed records export as PDF for a PSM audit or insurer visit.

Start with Dovient Lite

Sources

Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.

Questions

What is IIAR 6?
ANSI/IIAR 6 is the standard for inspection, testing and maintenance of closed-circuit ammonia refrigeration systems. It sets minimum tasks and frequencies for each type of component.
What is the difference between IIAR 6 and IIAR 9?
IIAR 6 is the ongoing inspection and maintenance program. IIAR 9 sets minimum safety requirements for existing systems and calls for an evaluation of the system against them.
How often do ammonia relief valves need to be replaced?
Follow your program and the valve maker. Many programs replace them every five years based on IIAR guidance, but check the edition of IIAR 6 your program uses.
Do I need IIAR 6 if my system is under 10,000 pounds?
PSM only applies at 10,000 pounds or more, but fire codes and insurers often reference IIAR standards for any ammonia system. Ask your fire code official and insurer which edition they expect.