What the rules require
An ammonia system holding 10,000 pounds or more of anhydrous ammonia is covered by OSHA's Process Safety Management standard (29 CFR 1910.119), and one holding more than 10,000 pounds by EPA's Risk Management Program (40 CFR Part 68). The mechanical integrity part of PSM, 1910.119(j), requires inspections and tests on vessels, piping, relief systems, emergency shutdowns, controls and pumps, at a frequency consistent with the manufacturer's recommendations and good engineering practice. Each one must be documented with the date, who did it, the equipment, the test and the result.
Smaller ammonia systems still fall under the EPA's General Duty Clause and OSHA's general rules. The industry standard for what to inspect and how often is IIAR 6, Inspection, Testing, and Maintenance of Closed-Circuit Ammonia Refrigeration Systems. Its tables set the inspection tasks and minimum frequencies for each type of component, and most PSM and RMP programs build their schedule on it.
How to use this checklist
- Do the engine room walk daily or each shift, using the first group below.
- Run the full checklist monthly, plus the less frequent IIAR 6 tasks for each component.
- Mark each item, photograph anything that is leaking, iced, corroded or damaged.
- Open a repair for every failed item, and record when it was fixed.
- Keep the completed checklists with the asset, so an auditor can see each component's history.
Cold storage maintenance records to keep
For PSM, every inspection and test needs the date, the inspector's name, the equipment identifier, what was done and the result, and deficiencies must be corrected before further use or in a safe and timely way (1910.119(j)(4) and (j)(5)). PSM compliance audits are due at least every 3 years. If you store food, your food safety plan and customers' audits will also ask for cold room temperature records and door and gasket maintenance.
Cold storage and refrigeration maintenance
Daily engine room walk; full list monthly
Engine room
- Compressor pressures and oil level in range
- No ammonia odor or visible leaks
- Ammonia detectors on, no alarms or faults
- Ventilation fans run and louvers open
- Emergency shutoff switch clear and labeled
- Eyewash and safety shower work, path clear
Vessels, piping and valves
- Vessel levels normal, no frost on gauges
- Piping labeled, no corrosion or damaged insulation
- Valves tagged, no packing leaks
- Relief valves in date, vent lines open
Condensers
- Fans and pumps running
- Coils clean, no scale buildup
- Water treatment working, basin clean
Evaporators and cold rooms
- Coils defrosting fully, no ice buildup
- Drain pans and lines clear, heat tape working
- Room holding set temperature
- Floor clear of ice, no frost heave
Doors and safety
- Doors close and seal, gaskets intact
- Door heaters work, no ice at the frame
- Inside release and lights work in each room
- Strip curtains and air curtains in place
Inspected by, date and notes go at the bottom of the printed sheet.
Run it in Dovient Lite
Add each compressor, vessel, condenser, evaporator, relief valve and cold room door as an asset, and set this checklist as a daily and monthly schedule, with compressor service by run hours from each compressor's hour meter. A work order opens when each is due; the operator marks each item pass, warning or fail on the phone, and the completed checklist stays on the component's record with who did it and when. Export the completed inspections and repairs as a PDF before a PSM compliance audit or RMP inspection.
Start with Dovient LiteSources
- OSHA, Process safety management of highly hazardous chemicals, 29 CFR 1910.119(j)
- EPA, Chemical accident prevention provisions, 40 CFR Part 68
- IIAR 6, Inspection, Testing, and Maintenance of Closed-Circuit Ammonia Refrigeration Systems
Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.
Questions
- How often should an ammonia refrigeration system be inspected?
- Walk the engine room daily or each shift, and follow the tasks and frequencies in IIAR 6 for each component. Under PSM, the frequency must follow manufacturers' recommendations and good engineering practice.
- Does PSM apply to my cold storage facility?
- It applies if a process holds 10,000 pounds or more of anhydrous ammonia. EPA's Risk Management Program applies above the same 10,000-pound threshold.
- What records do I need for refrigeration maintenance?
- For each inspection and test: the date, who did it, the equipment, what was done and the result, plus the repairs that followed. Keep PSM compliance audits and the follow-up on their findings.
- What should a cold room maintenance checklist cover?
- Evaporator coils and defrost, drain lines, door seals and heaters, inside release and lights, room temperature, and the floor for ice and frost heave.