Dovient

Ammonia refrigeration maintenance software

Mechanical integrity records an auditor can follow

Operators fill in the engine room log on a phone, IIAR 6 inspections and compressor services come due on schedule, and every test, repair and part stays on the equipment record for your PSM and RMP files.

Industrial refrigeration compressors in a machine room

IIAR 6 inspections and tests on a schedule

Add each piece of the ammonia system as an asset: compressors, condensers, evaporators, the recirculator and other vessels, relief valves, ammonia detectors, machinery room ventilation and the emergency shutoff. Each gets the inspections and tests IIAR 6 lays out, at the frequency your program sets, from annual checks to relief valve replacement every five years. Compressors can also run on run hours, such as an oil and filter change every 5,000 hours, and the work order opens with its checklist when the service is due.

IIAR 6 inspection and maintenance checklist
Dovient Lite preventive maintenance schedule: IIAR 6 inspections and tests on a schedule for an ammonia refrigeration or cold storage facility

Daily engine room log on the operator's phone

Each shift the operator walks the engine room with the daily checklist: suction and discharge pressure and oil pressure on each compressor, vessel levels, condenser fans and pumps running, no frost or oil on piping, detectors showing normal. Readings are typed in and each line is marked pass, warning or fail, with a photo where something looks wrong. The app works offline, so a dead spot in the engine room doesn't lose the log.

Cold storage and refrigeration maintenance checklist
Dovient Lite checklist on a work order (technician view): Daily engine room log on the operator's phone for an ammonia refrigeration or cold storage facility

Warehouse staff report problems from the floor

A forklift driver sees ice building on an evaporator in the freezer, or a dock door seal is torn. They pick the equipment in the app, describe it, add a photo and mark it a breakdown if the room can't hold temperature. The refrigeration operators are notified and turn it into a work order. A release still follows your emergency response plan, not the app.

Dovient Lite report a problem from the phone, with photo and breakdown flag: Warehouse staff report problems from the floor for an ammonia refrigeration or cold storage facility

Refrigeration parts on the shelf

Keep compressor oil, oil filters, coalescing elements, gaskets, valve packing kits, spare relief valves and evaporator fan motors in the parts list with a minimum quantity for each. Parts used on a work order come off stock and add to that asset's cost, and anything below its minimum is marked low stock.

Dovient Lite parts inventory with stock levels and low-stock flags: Refrigeration parts on the shelf for an ammonia refrigeration or cold storage facility

PSM and RMP mechanical integrity records

OSHA's PSM standard (1910.119(j)) asks for each inspection and test to show the date, who did it, which equipment, what was done and the result. Every completed checklist in Dovient Lite keeps those details on the asset's record. Before a PSM compliance audit or an EPA RMP inspection, export the completed inspections and the repairs that followed as a PDF.

OSHA PSM for ammonia refrigeration (mechanical integrity)

Every deficiency and repair in one list

A failed inspection item becomes a work order that the chief operator opens and assigns: a weeping valve packing, a detector that failed its bump test, a condenser fan bearing. Each one shows who is on it, the photos, the notes and the status, and overdue work is counted on the dashboard. PSM expects deficiencies to be corrected in a safe and timely way, and this list shows when each one was closed.

Compressor history, run hours and cost

Each compressor has one record: make, model and serial number, its run hours, its PM schedule, every overhaul and repair, the parts used and what it has cost. When a screw compressor is due for a major overhaul, you can see what it has needed since the last one.

Which refrigeration equipment fails most

The dashboard counts breakdowns and hours of downtime, shows the average time to repair (MTTR) and time between failures (MTBF), and lists the equipment that fails most often. If one evaporator keeps losing fan motors, you see it before it costs you a room of product.

How setup works

  1. 1

    Add your refrigeration equipment

    Import your equipment list from a spreadsheet (CSV or Excel) or add compressors, vessels, evaporators and valves one at a time.

  2. 2

    Set inspections and intervals

    Choose the checklists each piece of equipment needs (daily engine room log, IIAR 6 inspections) and the intervals in days or compressor run hours.

  3. 3

    Invite your operators and technicians

    They install the app and sign in. Operators see the day's log and inspections; technicians see the repairs assigned to them.

Set up Dovient Lite with us

Tell us how many compressors you run. We'll go through your inspections and service intervals with you and set up your account.

Prefer to start on your own? Start with Dovient Lite

Ammonia refrigeration checklists and guides

All templates

Questions

What is ammonia refrigeration maintenance software?

Software that keeps every inspection, test, scheduled service and repair on the ammonia system in one record per piece of equipment. Dovient Lite does this for small teams: engine room logs and inspections on a phone, services by date or run hours, and records you can export for PSM and RMP.

Does PSM apply to my ammonia refrigeration system?

OSHA's Process Safety Management standard (29 CFR 1910.119) covers processes with more than 10,000 pounds of anhydrous ammonia, and EPA's Risk Management Program (40 CFR Part 68) uses the same 10,000-pound threshold. Smaller systems are still covered by the general duty clause of the Clean Air Act (section 112(r)(1)). Your PSM program or consultant should confirm how it applies to your site.

What records does PSM mechanical integrity require?

Under 1910.119(j)(4), each inspection and test must be documented with the date, the name of the person who did it, the equipment's serial number or other identifier, a description of the inspection or test, and the results. Each completed checklist in Dovient Lite records the date, who completed it, the asset and each item's result, and it exports as a PDF.

How often does IIAR 6 require inspections?

IIAR 6 sets minimum inspection, testing and maintenance tasks for each type of component in a closed-circuit ammonia system, many of them annual, with relief valves replaced on a five-year cycle. Your PSM program, the equipment manufacturers and your daily operating checks can set shorter intervals. Use the edition your program references.

Does it alert me when a pressure or temperature reading is out of range?

No. Readings on the engine room log are typed in by the operator and marked pass, warning or fail. Dovient Lite doesn't send alarms, and a failed item doesn't open a work order by itself: the chief operator reviews it and opens one. Keep your control system and ammonia detectors as the alarm.

Does it track PSM audits, PHA revalidations and RMP updates?

No. Dovient Lite has no compliance calendar for PSM and RMP program deadlines such as the three-year compliance audit, the five-year PHA revalidation or the five-year RMP update. It covers the maintenance side: mechanical integrity inspections, tests, deficiencies and repairs.

Can I see repair costs and history per compressor?

Yes. Parts used on a work order come off stock and their cost goes to that compressor, along with labor and outside contractor charges such as an overhaul by your refrigeration contractor. Each asset's record shows its full history and cost.

Does the app work in the engine room without signal?

Yes. The phone app works offline, so operators can fill in the log and checklists where there is no signal, and the records sync when the phone reconnects.

Does it work for a cold store without ammonia?

Yes. Freon and CO2 systems, dock doors, forklifts and racking in a cold store run on the same schedules, checklists and work orders. The ammonia records (IIAR 6, PSM) are the ones you add only if you have an ammonia system.

How much does Dovient Lite cost?

Plans and prices are on the Dovient Lite pricing page: dovient.com/lite/pricing.

Reviewed

Mechanical integrity records an auditor can follow