What the EPA RMP rule is
The Risk Management Program rule (40 CFR part 68) comes from section 112(r) of the Clean Air Act. It requires facilities that hold large amounts of certain toxic or flammable chemicals to prevent accidental releases, plan their emergency response, and send EPA a Risk Management Plan (the RMP) that summarizes it.
For ammonia refrigeration the trigger is anhydrous ammonia: more than 10,000 pounds in a single process (68.130 and 68.115). An interconnected refrigeration system counts as one process. If your system is under the threshold, you are not covered by part 68, but the Clean Air Act general duty clause still requires you to identify hazards, design and maintain a safe system, and minimize the effects of any release.
Program level: most ammonia systems are Program 3
Each covered process is assigned Program 1, 2 or 3. EPA's guidance for ammonia refrigeration explains that these systems are usually covered by OSHA's Process Safety Management standard (29 CFR 1910.119), which places them in Program 3, the most detailed level. The Program 3 prevention elements closely match PSM, so one set of procedures and records can usually serve both.
What Program 3 requires, and how often
- Hazard assessment: worst-case and alternative release scenarios, and a five-year accident history (68.20 to 68.42).
- Process safety information, operating procedures, training, and management of change (68.65 to 68.75).
- Process hazard analysis, updated and revalidated at least every 5 years, and kept for the life of the process (68.67(f) and (g)).
- Mechanical integrity: written procedures, and inspections and tests of vessels, piping, relief valves, controls and pumps at the frequency the manufacturer and good engineering practice set, each one documented with the date, who did it, the equipment and the result (68.73).
- Compliance audit at least every 3 years, keeping the two most recent reports (68.79).
- Emergency response: coordinate with local responders at least once a year (68.93), and run a notification exercise every year with records kept for 5 years (68.96(a)). Facilities with their own response team also run tabletop and field exercises on the schedule in 68.96(b).
- Update and resubmit the RMP at least every 5 years, and sooner after certain changes (68.190).
What an inspector looks at
EPA or a delegated state agency checks that the submitted RMP matches the facility, then reviews the prevention program on paper and on the floor. Mechanical integrity records are where most findings come from: missing or overdue inspections, relief valves past their replacement date, and deficiencies found but not corrected. They also look at open PHA and audit recommendations and whether each one was resolved.
EPA amended the RMP rule in 2024, and changes to it have been proposed since. Check EPA's RMP pages for the current requirements before you set dates in your program.
Run it in Dovient Lite
Add each compressor, vessel, evaporator, relief valve set, detector and the machinery room ventilation as an asset. Set each mechanical integrity inspection and test as a schedule at the frequency your program sets, with a checklist attached; a work order opens when it is due, and the technician marks each item on the phone and attaches photos or test reports. Each completed inspection stays on the asset's record with who did it and when, and work orders export as a PDF for your compliance audit or an EPA inspection.
Start with Dovient LiteSources
- EPA, Chemical accident prevention provisions, 40 CFR part 68
- EPA, Risk Management Program rule overview
- EPA, Guidance for facilities on risk management programs
Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.
Questions
- Does my ammonia refrigeration system need an RMP?
- Yes, if it holds more than 10,000 pounds of anhydrous ammonia in one process. Below that, the Clean Air Act general duty clause still applies.
- How often does the RMP have to be updated?
- At least every five years, and sooner after changes such as a revised process hazard analysis or a change in program level.
- What is the difference between RMP and PSM?
- PSM is OSHA's rule protecting workers; RMP is EPA's rule protecting the public and environment. For ammonia refrigeration the prevention programs overlap closely, and RMP adds the hazard assessment, emergency response coordination and the plan submitted to EPA.
- How often are RMP compliance audits required?
- At least every three years, keeping the two most recent audit reports.