Dovient

Compliance

AHERA asbestos inspection & 6-month surveillance

What AHERA requires of a private school: the management plan, the 3-year AHERA inspection, the 6-month surveillance, staff training and the records to keep, in plain terms.

Who AHERA applies to

The Asbestos Hazard Emergency Response Act rules (40 CFR Part 763, Subpart E) apply to public school districts and to the owner of any nonpublic, nonprofit elementary or secondary school building. That covers most private and religious K-12 schools. For-profit private schools are not covered by AHERA, but OSHA's asbestos rules still protect their maintenance staff, so many follow the same program.

Each covered school must have a designated person who makes sure the program is carried out, and an asbestos management plan for each building, kept at the school and available for inspection (763.84 and 763.93).

What has to be done and how often

  • Initial inspection: by an accredited inspector before a building is used as a school, identifying all friable and nonfriable asbestos-containing building material (ACBM) (763.85(a)).
  • Every 3 years: AHERA reinspection by an accredited inspector of all known or assumed ACBM (763.85(b)).
  • Every 6 months: periodic surveillance, a visual check of every area of ACBM in the management plan, recording the date, who did it and any change in condition (763.92(b)).
  • Once each school year: notify parent, teacher and employee organizations that the management plan is available, and inform workers and occupants about inspections and response actions (763.84(c), 763.93(g)).
  • Training: 2 hours of asbestos awareness for maintenance and custodial staff who work in buildings with ACBM, within 60 days of hire for new staff, and 14 more hours for staff whose work disturbs ACBM (763.92(a)).
  • Warning labels next to ACBM in routine maintenance areas such as boiler rooms (763.95).

How to run the 6-month surveillance

  1. Take the list of ACBM locations from the management plan, such as pipe insulation in the boiler room or 9x9 floor tile in older classrooms.
  2. Visit every location. Look for damage, water stains, delamination, crumbling or new disturbance.
  3. Record the date, your name and any change in condition for each area, and take a photo.
  4. Send the record to the designated person for the management plan.
  5. Report any damage at once, so the area can be restricted and a response action decided.

Records to keep

The management plan holds the inspection and reinspection reports, the surveillance records, training records (name, job title, date, location and hours), operations and maintenance and response actions with contractor details, and the annual notifications (763.94). Keep it at the school's administrative office. An EPA or state inspector checks that the plan exists, that reinspections are no more than 3 years apart, that every 6-month surveillance is recorded, and that staff training is documented.

Run it in Dovient Lite

Add each area of asbestos-containing material from the management plan as an asset with its location, and set a 6-month schedule with a surveillance checklist attached. A work order opens when it is due; the person doing the walk marks each area pass, warning or fail on the phone with a photo, and the record is saved with who did it and when. Set the 3-year reinspection as its own schedule, attach the inspector's report to that work order, and export completed surveillance and reinspections as a PDF for the management plan.

Start with Dovient Lite

Sources

Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.

Questions

What is an AHERA inspection?
An inspection of a school building by an accredited asbestos inspector to find and assess asbestos-containing building material. It is done before a building is used as a school and repeated at least every 3 years.
Does AHERA apply to private schools?
It applies to nonpublic, nonprofit elementary and secondary schools, which covers most private and religious K-12 schools. For-profit schools are not covered by AHERA.
Who can do the 6-month periodic surveillance?
AHERA does not require an accredited inspector for surveillance. It is usually done by trained maintenance staff, who record the date, their name and any change in each area.
How long do I keep AHERA records?
Records stay in the management plan. Where all ACBM has been removed from an area, its records must be kept for 3 years after the next reinspection.