Teachers report classroom problems from their phone
A teacher finds a projector that won't turn on, a stained ceiling tile or a door that doesn't latch. They report it in the app with the room, a description and a photo, and mark it a breakdown if the room can't be used. The facilities team is notified, and the teacher can see when it's fixed.

HVAC, boilers and roofs on a schedule, summer work included
Set each recurring job once: HVAC filters every quarter, boiler service before the heating season, roof and gutter checks every fall and spring, fire drills every month of the school year. Summer projects, like a classroom repaint or a cooling tower cleaning, go on the schedule for June so the work orders open when students leave.

Monthly building and playground safety walk
The facilities manager walks each building with a checklist: exits and exit signs, fire extinguishers, emergency lights, the eyewash station in the science lab, stair treads and handrails, and the playground surfacing and equipment. Each item is marked pass, warning or fail with a photo, and the finished walk is saved with who did it and when.

Filters, lamps and ceiling tiles on the shelf
Keep HVAC filters, LED tubes, ceiling tiles, door closers and toilet flush valves in the parts list with a minimum quantity for each. Parts used on a work order come off stock and add to that asset's cost, and anything below its minimum is marked low stock.

Every repair in one list, by building and room
Each repair is a work order: who reported it, who is on it, the photos, the notes and the status. The facilities manager assigns jobs to the custodial and maintenance staff or an outside contractor, and overdue work shows on the dashboard.
AHERA 6-month surveillance and 3-year reinspection
Each area of asbestos-containing material in your management plan, such as pipe insulation in the boiler room or 9x9 floor tile in older classrooms, is checked every six months for damage or change. The surveillance is a scheduled checklist with photos, the accredited inspector's 3-year reinspection is a work order with the report attached, and both export as a PDF for the management plan.
AHERA asbestos inspection and 6-month surveillanceEach building system's history and cost
The boilers, rooftop units, water heaters, fire alarm panel and each piece of playground equipment have a record with every inspection, repair, part and contractor charge on it. The dashboard lists the equipment that fails most often, so when the board asks why a rooftop unit should be replaced, the record answers it.
How setup works
- 1
Add your buildings and equipment
Import your equipment list from a spreadsheet (CSV or Excel) or add the boilers, rooftop units and playground one at a time.
- 2
Set your checks and schedules
Choose the checklists you need (safety walk, AHERA surveillance, fire drill) and how often each one comes due.
- 3
Invite your facilities staff and teachers
They install the app and sign in. Staff see the work assigned to them; teachers can report a problem from their phone.
Set up Dovient Lite with us
Tell us how many students you have. We'll go through your buildings and inspection schedule with you and set up your account.
Prefer to start on your own? Start with Dovient Lite
School checklists and guides
All templatesQuestions
What is school maintenance software?
Software that keeps a school's repairs, scheduled maintenance and safety inspections in one record. Dovient Lite does this for small facilities teams: teachers report problems from a phone, recurring work opens as work orders on its due date, and completed inspections export as a PDF.
Does AHERA apply to private schools?
AHERA (40 CFR Part 763, Subpart E) applies to public schools and to private nonprofit elementary and secondary schools. Those schools must keep an asbestos management plan, do periodic surveillance every six months (763.92), have an accredited inspector reinspect every three years (763.85), and notify parents, teachers and staff each year that the plan is available (763.93). Private for-profit schools should check their state's rules.
What records go in the AHERA management plan?
The plan holds the inspection and reinspection reports, the results of each 6-month surveillance, response actions, custodial and maintenance staff training, and the annual notification. Dovient Lite keeps the surveillance checklists and the reinspection work orders with their attached reports, which you can export as a PDF for the plan.
How often do schools need fire drills?
The International Fire Code (section 405), which most states adopt with their own changes, calls for monthly fire drills in educational buildings. Some states require more drills in the first weeks of the school year, and lockdown drills are set by state law. Each drill can be a scheduled work order with its checklist.
Does it track AHERA and inspection deadlines for me?
Not as a compliance calendar. You set the 6-month surveillance, the 3-year reinspection and other inspections as schedules, and Dovient Lite opens each work order on its due date. It doesn't send reminders ahead of time, and anything not done on time shows as overdue on the dashboard.
Can parents or visitors report a problem?
No. Requests come from signed-in staff, so every request shows who reported it. There is no public request form.
Can I show the board what maintenance costs?
Yes. Each work order records labor, parts, outside contractor charges and other costs, and each building system's record adds them up. You can export cost by asset for the budget meeting.
Can we plan summer maintenance in it?
Yes. Summer projects and yearly services go on the schedule with June or July due dates, and their work orders open when the date comes, assigned to the people set on each schedule.
How much does Dovient Lite cost?
Plans and prices are on the Dovient Lite pricing page: dovient.com/lite/pricing.
Reviewed
Every classroom repair and AHERA record in one place

