The two rules behind feed mill maintenance

FDA's FSMA rule for animal food (21 CFR part 507) sets current good manufacturing practices for feed mills. The plant and equipment must be kept clean and in good repair (507.17, 507.19), food-contact surfaces cleaned as needed to prevent contamination, and equipment designed and maintained so it does not contaminate feed (507.22). Mills that must register with FDA also need a food safety plan with preventive controls unless an exemption applies, and records required under part 507 are kept for at least 2 years (507.208).

OSHA's grain handling standard (29 CFR 1910.272) names feed mills directly. It requires a written housekeeping program that sets how often grain dust is cleaned from floors, ledges and equipment (1910.272(j)), and preventive maintenance with regularly scheduled inspections of the mechanical and safety controls on dryers, grain processing equipment, dust collectors and bucket elevators (1910.272(m)). Each of those inspections needs a certification record with the date, the name of the inspector and the equipment's serial number or other ID.

A good maintenance schedule for a feed mill

  • Every shift: housekeeping in priority areas such as around bucket elevators and grinding rooms; walk the legs and listen for rubbing or slipping belts.
  • Daily: magnets cleaned and checked; screens and sifters checked for tears; pellet mill die and rolls checked for wear.
  • Weekly: bucket elevator belt tracking, bearing temperature and alignment checks; dust collector bags and differential pressure checked; hammer mill hammers and screens inspected.
  • By run hours: hammer rotation or replacement, pellet mill roll and die changes, gearbox oil, per the equipment maker.
  • Monthly: hazard monitoring devices on legs (belt speed, alignment, bearing sensors) tested; lockout procedures reviewed with the crew.
  • Yearly: full inspection of legs, conveyors and dust collection, and a review of the housekeeping program and sanitation schedule.

Sanitation and cleanout

Feed mill sanitation is mostly dry cleaning: removing dust, fines and residue from equipment, bins and floors, and keeping pests out. Write down how and when each area is cleaned, including flushes or sequencing between medicated and non-medicated feeds if you make both. After a repair on feed-contact equipment, check that tools and parts are removed and the equipment is clean before it goes back into production, and record it.

Records an inspector looks at

  • OSHA: the written housekeeping program, the preventive maintenance certification records, lockout procedures and hot work permits.
  • FDA: sanitation and cleaning records, pest control records, and if you have a food safety plan, the monitoring and corrective action records for your preventive controls.

Feed mill weekly maintenance and sanitation check

Weekly, with daily housekeeping

Bucket elevators and conveyors

  • Elevator belt tracking centered, no rubbing
  • Bearings not running hot or noisy
  • Hazard monitoring sensors working
  • Conveyor chains and paddles not worn

Grinding and pelleting

  • Hammer mill hammers and screens not worn
  • Magnets cleaned, no buildup
  • Pellet mill die and rolls within wear limits
  • Guards in place on all drives

Dust control

  • Dust collector bags intact, pressure normal
  • Priority areas clean, no dust buildup
  • No dust on ledges, motors or light fixtures

Sanitation

  • Equipment and bins clean of residue and fines
  • No signs of rodents, birds or insects
  • Spilled feed cleaned up, no wet spots
  • Cleaning tools and chemicals stored apart from feed

Inspected by, date and notes go at the bottom of the printed sheet.

Run it in Dovient Lite

Add each bucket elevator, hammer mill, pellet mill, dust collector and conveyor as an asset with its serial number. Set weekly checks by date and wear parts by run hours, each with a checklist; a work order opens when it is due, and the operator marks each item on the phone with a photo of any buildup or damage. The completed check stays on the equipment's record with who did it and when, which covers the date, name and equipment ID OSHA asks for, and the records export as a PDF for OSHA or FDA.

Start with Dovient Lite

Sources

Rules change and vary by state and county. Check the current text with your inspector or authority having jurisdiction. Last reviewed 2026-11-15.

Questions

Does FSMA apply to feed mills?
Yes. FDA's part 507 sets good manufacturing practices for animal food, and mills that must register with FDA also need a food safety plan with preventive controls unless they qualify for an exemption.
What's a good maintenance schedule for a feed mill?
Housekeeping every shift, daily checks of magnets, screens and pellet dies, weekly bucket elevator and dust collector checks, and wear parts replaced by run hours. Do a full inspection of legs and dust collection once a year.
What records does OSHA require at a feed mill?
A written housekeeping program and a certification record of each preventive maintenance inspection, with the date, the inspector's name and the equipment's ID.
How long do I keep FSMA records for animal food?
Records required under part 507 must be kept for at least 2 years after the date they were prepared.