TL;DR
Mold cooling failure causes heat check cracks in the containers. Check the cooling air flow to the affected section and inspect the mold cooling passages for blockage before replacing the molds.
What you might see
- containers showing heat check cracks at the base
- mold surface temperature above the cooling setpoint
- mold cooling air flow below the specified rate
- elevated container defect rate correlated to one section
Likely causes
Cooling air duct to the affected section partially blocked by scale or debris
Mold cooling hole deposits from mineral scale reducing airflow through the mold body
Cooling air supply pressure below the minimum for the current section speed
Section cooling valve failed to open fully
Required tools
- Cooling air flow meter
- Descaling agent for mold cooling passages
- Mold handling tools
- LOTO kit
Safety first
- Blank and blow molds retain significant heat from the forming process. Use heat-resistant gloves and allow cooling before handling.
- High-pressure cooling air supply. Bleed the circuit before opening any fitting.
Procedure
- 1
Stop the section and lock out the gob delivery.
- 2
Measure the cooling air flow to the section at the supply manifold. Compare to the specified minimum for this mold type.[1]
- 3
Inspect the cooling air duct to the section for debris or scale blockage.[1]
- 4
Remove the blank and blow molds and inspect the cooling holes for scale deposits. Clean with the approved descaling agent.
- 5
Check the section cooling valve position and actuator. Confirm the valve opens fully on the cooling command.
- 6
After cleaning and restoring flow, restart the section and monitor container base condition for the next 200 containers.
Sources
Bucher Emhart Glass Bucher Emhart NIS / FlexIS IS (Individual Section) Machine general technical documentation, Bucher Emhart Glass
General IS machine mold cooling system maintenance procedures (general)
More guides for Bucher Emhart Glass Bucher Emhart NIS / FlexIS
How to diagnose hydraulic pressure loss on a Bucher Emhart NIS / FlexIS IS machine
Hydraulic pressure loss on an IS machine slows the mechanisms and leads to timing errors. Check the hydraulic pump output and filter condition before tracing individual cylinder seals.
How to diagnose plunger mechanism timing faults on a Bucher Emhart NIS / FlexIS IS machine
Uneven container walls usually trace to the plunger arriving at the wrong point in the cycle. Check the plunger timing against the section timing diagram and verify the plunger air cylinder operation.