A calciner fuel trip causes rapid drop in calcination temperature. Identify whether the trip was a fuel supply failure or a burner fault, then restore fuel safely following the light-off procedure.
What you might see
- calciner outlet temperature dropping rapidly
- fuel flow meter reading zero
- calcination degree alarm active
- kiln inlet temperature rising
Likely causes
Fuel supply valve closed by an interlock due to low pressure or a safety system actuation
Fuel filter plugged reducing fuel flow below the burner minimum
Calciner burner flame detection failure causing a safety shutdown
Fuel line pressure below the minimum required for atomization
Required tools
- DCS access for alarm history
- Pressure gauge for fuel line
- Replacement fuel filter element
- Flame scanner cleaning kit
Safety first
- Never supply fuel to a hot calciner without confirmed ignition. Unburned fuel accumulation in a hot chamber is an explosion hazard.
- Thermal radiation from the calciner casing. Use appropriate PPE when working near the calciner body.
Procedure
- 1
Check the DCS alarm log for the root-cause trip signal. Identify whether it was a fuel pressure trip, a flame detection trip, or an emergency stop.[1]
- 2
Do not attempt to restart fuel to the calciner before identifying the trip cause.
- 3
Check the fuel supply pressure upstream of the calciner burner valve.[1]
- 4
Inspect the fuel filter differential pressure. Replace the filter element if the differential is above the trip setpoint.
- 5
If the trip was a flame detection fault, inspect the flame scanner for fouling or misalignment. Clean the scanner lens.
- 6
Follow the calciner light-off procedure to re-establish fuel and ignition in the correct sequence.
Warning: Never supply fuel to the calciner before confirming all combustion safety interlocks are healthy. An unlit fuel supply into a hot chamber is an explosion risk. - 7
After re-ignition, ramp the calciner temperature back to the target at the approved rate to avoid thermal shock to the refractory.
Sources
FLSmidth FLSmidth ILC / SLC-D Preheater Tower / Calciner general technical documentation, FLSmidth
FLSmidth calciner burner and fuel system operation documentation (general)
More guides for FLSmidth FLSmidth ILC / SLC-D
How to clear a cyclone blockage on a FLSmidth ILC / SLC-D preheater tower
A blocked preheater cyclone must be cleared promptly to prevent raw meal buildup and damage. Use the air cannon first, then the manual lance procedure if airflow does not restore.
How to remove riser duct coating buildup on a FLSmidth ILC / SLC-D preheater
Riser duct coating forms gradually from alkali sulfate condensation. Remove it during a planned kiln stop using mechanical lances. Monitor with pressure drop trending to schedule the next clean-out.
Stop fixing the same fault twice.